Sourcing a printed circuit board assembly, or PCBA, from China is a different job from buying a bare printed circuit board. A bare board is a single manufactured item with a drawing, a stack-up, and a set of tolerances. A PCBA is a finished electronic assembly: a bare board plus dozens or hundreds of components, soldered in place, inspected, tested, and packed. Every one of those steps can go wrong in a way that a bare-board order never could. A wrong component revision, a substituted part, a cold solder joint under a ball grid array, or a test that was never run can turn a shipment of boards into a shipment of scrap.

This guide is written for the overseas buyer who has a design and needs a Chinese factory to build it reliably. It answers seven practical questions: what documentation to prepare before asking for a quotation, how to choose a factory, what to check before placing an order, who should buy the components, how to compare quotations, what inspection and testing to require, and what the most common problems are and how to prevent them. It ends with two checklists you can send directly to a supplier: a PCBA request-for-quotation checklist and a pre-order factory verification checklist.

This guide concentrates on decisions that are specific to buying assembled boards. It does not repeat general quality-control advice about golden samples and mass production, which is covered in the companion guide on electronics quality control in China. Where this guide touches on supplier verification, counterfeit parts, pre-shipment inspection, or shipping, it points to the companion articles on how to verify an electronics supplier in China, avoiding counterfeit electronic components from China, pre-shipment inspection for Shenzhen electronics, and packaging and shipping electronics from China. If your product needs certificates or declarations, see the companion guide on verifying electronics compliance documents from China.

Contents

  1. What PCBA Sourcing Really Means
  2. What to Prepare Before You Ask for a Quotation
  3. How to Choose a Reliable PCBA Factory in China
  4. How to Tell a Real PCBA Manufacturer from a Trading Company or Assembly Subcontractor
  5. What to Check Before You Place an Order
  6. Who Buys the Components: Turnkey, Partial Turnkey, or Consigned
  7. How to Compare PCBA Quotations Like for Like
  8. What Inspection and Testing Should You Require
  9. Solder Paste, Stencil, and Reflow: Where Assembly Quality Is Decided
  10. The Most Common Problems and How to Prevent Them
  11. PCBA RFQ Checklist
  12. Pre-Order Factory Verification Checklist
  13. Frequently Asked Questions
  14. Conclusion
  15. Sources

What PCBA Sourcing Really Means

PCBA stands for printed circuit board assembly. It is the process of taking a fabricated bare board and populating it: printing solder paste through a stencil, placing surface-mount components with a pick-and-place machine, reflowing the board in an oven so the paste melts and forms joints, adding through-hole parts by wave soldering, selective soldering, or hand soldering, and then inspecting and testing the finished assembly. The factory you choose is therefore not only a board fabricator. In most cases it is an assembler that either fabricates the bare board in-house or buys it from a partner fabricator, and then runs the surface-mount line, the through-hole line, the inspection stations, and the test benches.

That matters because the risks are different. When you buy a bare board, the main risks are dimensional and electrical: wrong thickness, wrong impedance, a shorted net. When you buy a PCBA, you add component risk, process risk, and test risk. Component risk means a part may be counterfeit, substituted, the wrong revision, or past its shelf life. Process risk means paste may be misprinted, a part may be placed backwards, or a joint may be cold. Test risk means a board may leave the factory having never been powered up, so the first person to discover a fault is your customer.

The same caution applies to quality language. A factory that says it builds to IPC-A-610 may mean it inspects to that standard, or it may mean it has heard of it. The buyer has to name the standard, the revision, and the performance class in writing, and ask the factory to confirm in writing. The relevant standards are introduced below, and they recur throughout this guide because they are the shared language that lets a buyer in one country and a factory in another agree on what "good" means.

IPC-A-610J, Acceptability of Electronic Assemblies, Revision J, dated March 2024 (announced by IPC on 8 April 2024), is the post-assembly acceptance standard, and is described as the most widely used electronics assembly acceptance standard. It gives visual acceptability criteria only: it does not provide criteria for cross-section evaluation or X-ray inspection, and points to J-STD-001 for X-ray guidance. J-STD-001J, Requirements for Soldered Electrical and Electronic Assemblies, current revision J, April 2024, is a principal industry-consensus standard for soldering processes and materials. It sets requirements for materials, methods and acceptance of soldered assemblies, including X-ray guidance in Appendix C. The two are developed in synergy and are often used together: J-STD-001 states the requirements for building and soldering an assembly, and IPC-A-610 states how to judge the finished assembly by visual inspection. IPC-2221C, Generic Standard on Printed Board Design, current revision C, December 2023, is the foundation design standard for the IPC-2220 series and establishes the generic requirements for the design of printed boards; sectional standards such as IPC-2222, IPC-2223, IPC-2226 or IPC-2228 may also apply. IPC-1782B, Standard for Manufacturing and Supply Chain Traceability of Electronic Products, Revision B, 2023, establishes minimum requirements for manufacturing and supply chain traceability based on perceived risk, and applies to printed board assemblies as well as mechanical assembly and printed board fabrication. For automotive assemblies, IPC publishes the September 2025 automotive addendum, IPC J-STD-001JA / IPC-A-610JA. It is not a standalone document and must be used with J-STD-001J and IPC-A-610J. Clause 1.1 (Scope) of J-STD-001JA states that use of the addendum implies that the product belongs to Class 3. Clause 0.4 (Use) further specifies that, where the addendum does not supplement the criteria, the Class 3 requirements of J-STD-001J apply. The revision dates in this guide are taken from IPC's official standards revision table.

None of these standards is a substitute for your own specification. They give you a framework and a vocabulary. Your purchase order still has to say which class, which tests, which acceptance criteria, and which documents apply to your board. The sections that follow show you what to write.

What to Prepare Before You Ask for a Quotation

An inaccurate PCBA quotation almost always starts with incomplete documentation. The factory cannot price what it cannot see. If it cannot see the component list, it guesses the component cost. If it cannot see the placement file, it guesses the assembly time. If it cannot see the test requirements, it prices no test at all, and the cheapest quotation you receive is often simply the one that left the most work out. Preparing a complete data package before you ask for a price is the single highest-value step in PCBA sourcing, and it costs you nothing but time.

Start with the fabrication data. The de facto standard format is Gerber, maintained by Ucamco. The current specification is the Gerber Layer Format Specification, Revision 2026.05 (Ucamco; the format is also known as Extended Gerber, or RS-274X, but do not call the 2026.05 document "RS-274X Revision 2026.05"). Gerber is a UTF-8 format for representing printed circuit board fabrication data, and one single file completely describes a single printed circuit board layer. A Gerber package carries one image per file: copper, solder mask, paste, legend, and profile. Drill data rides in a separate Excellon file. There is no stack-up or job data inside the image files; that is the role of the Gerber Job file, a JSON file with the extension .gbrjob. The X2 extension adds standardised attributes naming layer function and pad roles, such as surface-mount device, via, and fiducial, and can carry the CAD netlist. The X3 extension, added in revision 2020.09, adds component layers carrying component location, orientation, reference designator, footprint, value and manufacturer part number, which can support assembly. X3 does not automatically replace the bill of materials, the centroid file or any other assembly document. Confirm which Gerber generation and attributes your CAD software exports and which your factory's CAM system accepts; not every export contains every attribute. Standard Gerber, RS-274-D, was revoked in 2014 and is superseded by Extended Gerber, so do not send RS-274-D files.

In practice, most buyers still send Gerber plus separate files, and most Chinese PCBA factories accept that package without difficulty. The table below compares the three formats so you can check what your package actually contains.

Data item Gerber X2 / X3 ODB++ v8.1 IPC-2581 Rev C
Structure Multiple flat files, one per layer, plus separate drill file Single compressed directory tree Single XML file
Netlist X2 can carry the CAD netlist as attributes Yes Yes
Drill data Separate Excellon file Included Included
Stack-up No, separate job file or drawing Yes, with materials Yes, with materials and impedance
Bill of materials No, separate file Yes Yes
Placement and centroid X3 carries component location and orientation, but a separate pick-and-place file is still the usual handover Yes Yes
Maintainer and licence Ucamco, open specification Siemens, proprietary IPC consortium, open standard

The ODB++ column above means the ODB++Design Format Specification, Release 8.1, Update 4 (August 2024). IPC-2581 Rev C is dated November 2020; the schema defines a wide field set, but CAD exporters populate different subsets and CAM importers read different subsets, so confirm which fields your CAD actually exports and which your factory's CAM actually consumes.

Whichever format you use, the fabrication data is only one part of the package. A complete PCBA request-for-quotation package also needs the following items, and each one has a reason a factory needs it before it can price your job.

First, the bill of materials, or BOM. This is the list of every component on the board: reference designator, quantity per board, manufacturer name, full manufacturer part number including suffix, package type, value or specification, and any approved alternatives. The full part number including the suffix matters because the suffix often encodes tolerance, voltage rating, temperature grade, or packaging. A resistor listed as 10k without a tolerance, a voltage rating, and a package size cannot be priced or bought accurately. State the BOM revision on the file itself and on the purchase order, and never send a BOM without a revision letter or number. If a component has an approved alternative, name it explicitly with its full part number and the conditions under which it may be used. If no alternative is approved, say so in writing: "no substitutions without written buyer approval." That one sentence prevents a large share of substitution problems.

Second, the centroid file, also called the pick-and-place file. This gives the pick-and-place machine the X and Y coordinates, rotation, side of the board, and reference designator for every surface-mount component. Without it, the factory must generate placement data from your Gerber files, which adds time, adds a chance of error, and may be priced as extra engineering work. Generate the centroid file from your CAD tool, check that the rotation values match your assembly drawing, and include it in the package.

Third, the assembly drawing. This is the human-readable drawing that shows component outlines, reference designators, polarity marks, pin 1 marks, and any special assembly notes: keep-out zones, hand-soldered parts, conformal coating areas, and labels. The assembly drawing is what the factory's operators and inspectors actually look at. Make sure the polarity marks on the drawing match the centroid file and the Gerber silkscreen. A polarity mark that is clear in CAD and missing on the silkscreen is a common cause of reversed diodes and capacitors.

Fourth, the printed circuit board specification. This states the board material, the number of layers, the board thickness, the copper weight, the surface finish, the solder mask colour, the silkscreen colour, the minimum trace and space, the minimum drill size, and the impedance requirements if any. It also states the panelisation: whether you supply a panel drawing or the factory should panelise, the panel size, the breakaway method, and the fiducials. If you do not state the surface finish, the factory will choose the cheapest one, which may not suit your soldering process or your shelf-life needs.

Fifth, quantities and delivery schedule. State the prototype quantity, the first production quantity, and the expected annual volume or the next order quantity. A factory prices a 10-piece prototype differently from a 1,000-piece production run, and it buys components differently too. If you only ask for a prototype price and later expect the same unit price at volume, you will be disappointed. Ask for both prices at the start, and ask how the price changes at stated volume steps.

Sixth, approved component alternatives and sourcing constraints. State which components must come from the original manufacturer or an authorised distributor, which components may come from an independent distributor with your approval, and which components you will supply yourself. This is the point where the sourcing model decision, covered in a later section, begins. Even at the quotation stage, naming your constraints prevents a factory from quoting a part it cannot buy through an approved channel.

Seventh, testing requirements. State which tests you require: solder paste inspection, automated optical inspection, X-ray inspection, in-circuit test, functional test, flying-probe test, boundary scan, or a combination. State the test coverage you expect and who supplies the test fixture, the test program, and the test firmware. If you do not state the tests, the factory will quote the cheapest inspection it normally performs, and you will discover the gap only when a faulty board reaches your customer. Testing is covered in detail in a later section; at the quotation stage, the point is simply that a quotation without a defined test scope is not comparable with a quotation that includes one.

Eighth, any special process requirements: conformal coating, potting, cable assembly, enclosure assembly, programming, calibration, labelling, or specific packaging. Each of these is a separate operation with its own cost and its own failure mode. List them explicitly so the factory prices them rather than discovering them after the order is placed.

The companion guide on electronics supplier quotation and RFQ checklists covers general RFQ practice for electronics suppliers. The PCBA-specific RFQ checklist at the end of this guide builds on that general practice with the file formats, component data, and test definitions that are unique to assembled boards. Use both together.

How to Choose a Reliable PCBA Factory in China

Choosing a PCBA factory is a capability decision before it is a price decision. A factory that is cheap and cannot build your board is not cheap; it is expensive in rework, in delay, and in field failures. The checks below are grouped by what you can verify before you spend money, and each one maps to a concrete question you can ask and a concrete piece of evidence you can request.

Start with surface-mount and through-hole capability. Ask for the surface-mount line list: the number of lines, the placement machines, the smallest package the line places routinely, the finest pitch it places routinely, the maximum board size, and whether it places on both sides of the board. A factory that places 0201 passives and 0.4 mm pitch ball grid arrays every day is a different factory from one that places 0603 passives and nothing finer. Ask the same about through-hole: does it run wave soldering, selective soldering, and hand soldering, and which one would it use for your connectors and transformers? Through-hole is still used for connectors that are frequently mated or plugged, such as USB, power, and terminal blocks, and for heavy or large parts such as transformers, relays, large electrolytic capacitors, and TO-220 power devices, and for parts facing cable pull, operator handling, vibration, or heat cycling. The lead anchors through the full board thickness, giving strong mechanical retention. High-current and high-power applications can use either technology depending on ratings, copper design, thermal management, and mechanical loading, so do not accept a blanket claim that through-hole is for high power. Ask which technology the factory would use for each of your through-hole parts and why.

Next, engineering support. A good PCBA factory has engineers who review your files before production and tell you what will be hard to build. Ask whether the factory performs a design-for-manufacturing review, what it covers, and whether it is charged. Ask who reviews the Gerber files, the BOM, and the centroid file, and what happens when the review finds a problem. Ask for an example of a design-for-manufacturing issue the factory caught for another customer, with the customer name removed. A factory that does a real review will have examples. A factory that does no review will simply build what you sent, including the mistakes.

Next, component procurement. Ask where the factory buys components, which distributors it uses, whether it buys from authorised distributors or from the open market, and how it verifies authenticity. Ask how it handles allocated or long-lead-time parts, and what it does when a part on your BOM is obsolete or out of stock. Component procurement is covered in detail in the sourcing-model section below, but at the selection stage the point is simple: a factory whose component sourcing you cannot see is a factory whose component quality you cannot trust. The companion guide on avoiding counterfeit electronic components from China explains the counterfeit risk in depth, and the checks in that guide apply directly to any PCBA factory you consider.

Next, quality systems and inspection equipment. Ask which acceptance standard the factory inspects to, which revision, and which performance class. The acceptance standard for assembled boards is IPC-A-610J, Revision J, dated March 2024 (announced by IPC on 8 April 2024), which gives visual acceptability criteria. The process standard is J-STD-001J, current revision J, April 2024, which sets requirements for materials, methods and acceptance of soldered assemblies, including X-ray guidance in Appendix C. The buyer has the responsibility to specify the performance class in the contract or purchase order; it is not a default. The three performance classes, as named in J-STD-001J and IPC-A-610J, are as follows.

Class 1, General Electronic Products, covers consumer products and some computer and peripheral products where cosmetic imperfections are not important and the major requirement is function of the completed printed board. Class 2, Dedicated Service Electronic Products, covers communications equipment, sophisticated business machines, and instruments where high performance and extended life are required and uninterrupted service is desired but not critical, and where certain cosmetic imperfections are allowed. Class 3, High Performance/Harsh Environment Electronic Products, covers equipment and products where continued performance or performance-on-demand is critical, downtime cannot be tolerated, and the product must function when required, for example life-support items or flight-control systems, where high levels of assurance are required and service is essential.

As a buyer, you should map your product to a class before you talk to factories. Class 1 fits general consumer products. Class 2 fits dedicated-service and extended-life commercial and industrial products. Class 3 fits high-reliability and safety-critical products. Naming the class in the purchase order removes an entire category of argument later, because the factory and the buyer are then judging the same board against the same criteria. The class reflects the intended end-use and performance requirements of the assembly. It is not a factory quality grade or a guarantee of reliability: specifying Class 3 does not by itself establish product reliability; the design, materials, process controls, inspection and testing must also be appropriate for the intended application. Also ask whether the factory's inspectors are trained and certified to the standard it claims, and ask to see a sample inspection report. A factory that inspects to IPC-A-610 should be able to show you what its inspection report looks like, what defect codes it uses, and how it records rework.

Ask about inspection and test equipment by name, not by category. Ask whether the factory has solder paste inspection, automated optical inspection, X-ray inspection, in-circuit test, functional test, and flying-probe test, and which of those it owns, which it outsources, and which it would use for your board. The capabilities and limits of each method are covered in the inspection section below. At the selection stage, the warning sign is a factory that claims to have everything and cannot show you any of it, or a factory that says inspection is unnecessary because its process is good. Inspection is not a sign of a bad process; it is how a good process proves itself.

Next, experience with similar products. Ask what products the factory has built that resemble yours in package types, board density, and test requirements. Ask for the finest pitch it has built in production, the largest ball grid array it has built in production, and the most complex functional test it has run. Ask how it handles moisture-sensitive components, because a factory that builds boards with moisture-sensitive devices must store them in sealed moisture-barrier bags with a humidity indicator card and a moisture sensitivity level label, and bake them only when their moisture-sensitivity level and exposure history require it. If your board has no moisture-sensitive parts, this question still tells you whether the factory understands component handling. Ask how it handles electrostatic discharge protection, and whether the production floor is an electrostatic discharge protected area with grounded workstations, wrist straps, and proper packaging.

How to Tell a Real PCBA Manufacturer from a Trading Company or Assembly Subcontractor

Not every company that offers PCBA services is a PCBA manufacturer. Three kinds of supplier commonly appear in search results and on sourcing platforms: the genuine PCBA manufacturer, the trading company, and the assembly subcontractor. Each can be legitimate in the right situation, but they are different businesses with different risks, and the buyer needs to know which one is being quoted.

A genuine PCBA manufacturer owns or directly controls the surface-mount lines, the through-hole soldering, the inspection equipment, and the test benches. It employs the engineers who review your files, the operators who run the lines, and the inspectors who judge the boards. It can show you its factory, its equipment list with machine models, its production schedule, and its quality records. It buys components through named channels and can show you purchase records with traceability. When you ask a technical question, the answer comes from an engineer who works in the building.

A trading company does not own the production lines. It takes your order and places it with a factory it works with, adding a margin. A trading company can be useful when you need a single point of contact across many product types, or when you need help with logistics and communication. But it adds a layer between you and the people who actually build your board. That layer costs money, slows down technical communication, and weakens your control over component sourcing, because you cannot see where the components were bought or how the boards were inspected. If you work with a trading company, ask it to name the factory that will build your board, and ask to verify that factory directly. If it refuses to name the factory, you are buying blind.

An assembly subcontractor owns some production capability but not the full chain. It may own a surface-mount line but outsource bare-board fabrication, or own assembly but outsource testing, or own everything except component procurement. Subcontracting is not itself a problem; many good factories outsource one step. The problem is undisclosed subcontracting, where a step you assumed was done in-house is done by an unknown third party with unknown quality control. Ask every supplier to list, in writing, which steps are done in-house and which are outsourced, and to name the subcontractor for each outsourced step. Then verify the subcontractor the same way you verified the main factory, or require the main factory to take responsibility for the subcontractor's work in writing.

Several checks separate a manufacturer from an intermediary. Ask for a video call from the production floor, live, with the camera moving through the surface-mount lines, the inspection stations, and the component stores. A manufacturer can do this easily; an intermediary will stall, offer a recorded video, or show you a showroom. Treat a live video walkthrough as supporting evidence, not conclusive proof that the company operates the factory it claims to operate. Ask for the business licence and check that the registered business scope includes electronics manufacturing or electronic assembly. A licence proves the company exists, not that it owns a factory: verify the legal entity, its registered business scope and the actual production site together, and compare the legal entity named on the licence with the contracting party, invoice issuer and payment beneficiary. Ask for the equipment list with machine brands and models, and check that the models match the capability claimed. A factory that claims to place 0201 components should have a placement machine that is rated for that package. Ask for a recent production record for a similar product, with customer-identifying details removed, showing the date, the quantity, the inspection results, and the test yield. Ask how many engineers work in the factory and what their roles are. A manufacturer has process engineers, quality engineers, and test engineers on staff; an intermediary has sales staff.

Also check the address. A manufacturer has a factory address with a production floor. A trading company may have only an office address. That alone does not prove anything, but an office-only address combined with a refusal to name the production factory is a strong signal. The companion guide on how to verify an electronics supplier in China gives a fuller set of supplier verification checks, including business licence checks, on-site audit points, and documentation checks. Use it alongside this section.

What to Check Before You Place an Order

Placing a PCBA order is a commitment of money, time, and trust. The checks in this section should be completed before the purchase order is signed, not after the boards arrive faulty. They are grouped in the order a buyer should work through them: capability, sample, documentation, sourcing, schedule, cost, payment, and acceptance.

First, factory capability verification. Do not place a production order with a factory whose capability you have only read about in a sales message. Verify the lines, the inspection equipment, and the test equipment against your board's requirements, using the checks in the two sections above. If your board has a ball grid array, confirm the factory has X-ray inspection and ask for a sample image, defined coverage and acceptance criteria, and evidence that the chosen technique can inspect your actual package. A factory owning an X-ray machine does not by itself guarantee adequate inspection. If your board needs in-circuit test, confirm the factory has an in-circuit test system and ask who writes the test program. If your board needs functional test, confirm who supplies the fixture and the test program, and confirm the test access points and pass and fail limits were designed into the board from the start. If any required capability is outsourced, name the subcontractor and verify it too. The pre-order factory verification checklist at the end of this guide turns these checks into a list you can send.

Second, sample evaluation. Always build a sample or pilot batch before committing to full production, and evaluate it properly. A sample is not a formality; it is your only chance to find design errors, process errors, and documentation errors while the cost of fixing them is still low. Inspect the samples yourself or through an independent inspector. Check the solder joints against the acceptance standard you named. Power up the boards and run the functional test. Check the component markings against the BOM, line by line, including the suffix of every part number. Check the revision markings on the board and on the packaging. Record every defect you find, with photographs, and send the list to the factory with a request for root cause and corrective action. Do not approve mass production until the sample defects are closed. If the factory resists a sample stage, or treats sample approval as a rubber stamp, that is a warning sign. The companion guide on electronics quality control in China covers sample approval and mass production control in depth; this guide does not repeat it, but the sample stage it describes is a precondition for everything that follows here.

Third, BOM review. Before the order is placed, ask the factory to review your BOM line by line and confirm, in writing, that every line is available, that the price and lead time are as quoted, and that any line it cannot supply is flagged. Ask it to flag obsolete parts, parts with long lead times, parts with minimum order quantities that create excess stock, and parts where the quoted part differs from your specified part in any way, including the suffix. A BOM review that finds no issues at all on a board with more than a hundred lines is not a thorough review; it is a skipped review. Ask what the factory checked. Common BOM review findings include a part that is out of stock at every authorised distributor, a part whose manufacturer has issued a product change notice, a part whose package in the BOM does not match the footprint on the board, and a part whose voltage rating is below the circuit requirement. Each of these is cheap to fix before ordering and expensive to fix after assembly.

Fourth, component sourcing arrangements. Confirm in writing who buys each component line, from which channel, and who is responsible for authenticity. This is the sourcing-model decision covered in the next section. Before the order, the arrangement must be settled line by line, not as a general statement. If the factory is buying components, ask for the distributor names and ask how authenticity is verified. If you are supplying components, confirm the kit requirements, the delivery date for the kit, and what happens if the kit is short or a reel is damaged. If the arrangement is partial, confirm exactly which lines are yours and which are the factory's, and confirm that the split is recorded on the purchase order.

Fifth, production lead times. Ask for the lead time in writing, broken into its parts: bare-board fabrication time, component procurement time, stencil and tooling time, assembly time, test time, and packing and shipping time. A single lead-time number hides the part that is actually at risk. In most PCBA orders the long pole is component procurement, not assembly, because a single long-lead-time or allocated part can hold up the whole order. Ask which component has the longest lead time and what the factory's plan is if that part slips. Ask what happens to your production slot if a component is late: do you lose the slot, or does the factory hold it? Get the answer in writing before you pay a deposit.

Sixth, tooling and setup charges. Ask for every one-off charge to be itemised: stencil cost, solder paste, fixtures, test fixture, programming setup, and any engineering or design-for-manufacturing review fee. Ask whether the stencil and the test fixture belong to you after you pay for them, and whether the factory will store them, return them, or charge you again on a repeat order. A stencil is a thin sheet of foil with openings called apertures matching the printed circuit board's solder pads, and it is made for your board; you paid for it, so you should own it. Ask whether the setup charge is charged again on a repeat order with no design change. If it is, ask why.

Seventh, payment terms. Confirm the deposit percentage, the milestone payments, the final payment trigger, and the payment method. Confirm what happens to the deposit if the factory cannot deliver, and what happens to the components the factory bought if you cancel. Confirm the currency, who bears the bank charges, and whether the price is fixed for the validity period stated on the quotation. Confirm what happens if a component price changes between quotation and purchase order, and who absorbs the change. These points belong in the purchase order, not in a chat message.

Eighth, written acceptance criteria. This is the most important check in the whole section. Before the order is placed, write down what "acceptable" means for your board, and put it in the purchase order. The acceptance criteria should name the acceptance standard and revision, the performance class, the inspection methods and their coverage, the test methods and their pass and fail limits, the allowed defect levels, the rework rules, and the documentation that must ship with the boards. A purchase order that says "good quality" is not an acceptance criterion; it is an invitation to argue. A purchase order that says "inspected to IPC-A-610J, Class 2, for visual acceptance, 100 percent automated optical inspection after reflow, X-ray inspection of all ball grid array joints judged against the applicable X-ray criteria in the agreed revision of J-STD-001 and the product-specific limits in this order, functional test per attached test procedure, zero missing components, zero wrong polarity" is an acceptance criterion. The factory can agree to it, or it can propose a change before the order, which is exactly when you want that conversation to happen.

If any of these eight checks cannot be completed, do not place the order yet. Delay is cheaper than a shipment of boards you cannot use. A factory that is unwilling to answer these questions before the order will be less willing to answer them after it has your deposit.

Who Buys the Components: Turnkey, Partial Turnkey, or Consigned

The decision about who buys the components is one of the largest risk decisions in PCBA sourcing. It determines who bears the cost of a counterfeit part, who owns excess stock, who resolves a shortage, and who is liable when a component fails after assembly. There are three common models, and the first thing to understand is that the labels are not standardised. Industry sources state this plainly: the terminology is not standardised, and you should never rely on the label. Define the scope in writing, on the purchase order. Neither label alone settles title to material, shortages, excess stock, approved substitutes, or liability. The contract governs. Present the models below as common commercial practice, and settle every point in writing for your order.

Full turnkey means the assembler buys all components, and in a full turnkey arrangement also the bare printed circuit boards, plus assembly, inspection, test, and packing. The buyer supplies the design data and the BOM. The buyer's work is lightest in this model, and the assembler's responsibility is widest. But turnkey does not remove the buyer's risk. In particular, turnkey does not automatically remove inventory risk. Suppliers buy in reel and minimum-order quantities, and most agreements make the customer liable for the excess left over from minimum buys, engineering changes, forecast reductions, and cancellations. Who ultimately pays for minimum-order-quantity-driven excess is contract-specific; there is no universal rule. If you choose turnkey, ask the factory to state, in writing, who owns excess stock, who pays for minimum-order-quantity excess, and what happens to excess stock when the order is cancelled or the design changes. Do not assume the factory absorbs it.

Partial turnkey, also called hybrid, means the buyer supplies selected component lines and the assembler buys the rest. The buyer-supplied lines are typically a programmed microcontroller, a proprietary module, an allocated or scarce integrated circuit, or a field-programmable gate array bought at last-time-buy pricing. A partial turnkey arrangement is rarely a clean fifty-fifty split; it is a line-by-line split driven by which parts the buyer can buy better or must control directly. The split must be recorded line by line on the purchase order, because every responsibility that follows, shortage, authenticity, excess, price movement, and failure liability, is split by line.

Consigned, also called kitted, means the buyer supplies all components as a kit. The assembler provides labour, stencil, and process, verifies the kit against the BOM, assembles the boards, and usually returns unused material. The buyer carries the component risk in this model, and the buyer must therefore supply a kit that is complete, correct, labelled, counted, and protected. Industry guidance puts it directly: if the supplier buys the part, the supplier must show traceability; if the buyer ships the kit, the buyer must ship complete, correct, labelled, counted, and protected inventory.

The table below summarises the typical responsibility split. Treat it as typical practice, not as fixed law; the contract governs in every case.

Responsibility Turnkey Partial turnkey Consigned
Shortage at kitting Assembler resolves Shared by line Buyer resolves
Authenticity and counterfeit liability Assembler for lines it bought Split by line Buyer
Excess and attrition stock Assembler carries normal attrition, but minimum-order excess is contract-specific Split by line Buyer owns all excess, leftover normally returned at buyer freight
Price movement between quotation and purchase order Assembler absorbs within validity window Buyer absorbs on its lines Buyer absorbs on its lines
Component failure after assembly Assembler investigates and claims against its source Split and traceable by line Buyer
Incoming inspection Assembler inspects, including the buyer lines and kit Assembler inspects, including the buyer lines Assembler inspects the kit

Choosing between the models is a trade-off, and the right choice depends on your situation. Turnkey is the simplest for the buyer and makes sense when the factory has strong component sourcing, when you do not have access to better pricing, and when you want a single party responsible for the finished board. Its risks are that you cannot see the component supply chain, that you depend on the factory's sourcing discipline, and that you may still be liable for excess stock from minimum-order quantities. Partial turnkey makes sense when you have a few critical, scarce, or proprietary parts that you can buy better or must control directly, and you are willing to manage those lines yourself while the factory buys the rest. Its risk is the boundary: when a board fails, the first argument is about which side's part failed, so line-by-line traceability is essential. Consigned makes sense when you already hold the components, when you have a trusted supply channel the factory does not, or when you need full control over authenticity. Its risks are the heaviest for the buyer: you own the shortage risk, the excess risk, and the authenticity risk, and you must deliver a perfect kit.

Whichever model you choose, the kit and handling requirements for buyer-supplied material are specific, and they are worth stating in full. Components should be supplied in tape-and-reel packaging; loose parts may need hand placement or re-reeling, which adds cost and risk. Moisture-sensitive components must be supplied in sealed moisture-barrier bags with a humidity indicator card and a moisture sensitivity level label per IPC/JEDEC J-STD-033D:2018, and baked only when their moisture-sensitivity level, floor-life exposure and humidity-indicator-card reading require it. Not every opened moisture-barrier bag needs baking. All components must be supplied in electrostatic discharge safe packaging. Every reel and tray must be labelled with the manufacturer, the full manufacturer part number including the suffix, the quantity, the date code, and the lot code, plus a packing list matching the BOM line for line. Agree the overage in advance, as a specific quantity and maximum for each line. An allowance of 3 to 10 percent on small passives is an illustrative planning range, not a rule: published assembler guides vary widely by package size, part type and run size, and small first builds often need more. Expensive connectors and integrated circuits should normally have tightly controlled overage, with unused quantities accounted for or returned. The overage exists because a small number of parts is lost to setup, to attrition on the line, and to rework. If you supply exactly the board quantity with no overage, the factory will run short, and the last boards will wait for a resupply.

Counterfeit and substituted components deserve special attention in every model, because the risk follows the buyer of the part. In a turnkey order, the assembler buys the parts and must show traceability for them. Ask how it verifies authenticity, which distributors it uses, and what records it keeps. In a consigned order, you are the buyer of the parts, and the authenticity risk is yours; buy from the original manufacturer or an authorised distributor, keep the purchase records, and do not buy from an unknown broker to save money. In a partial turnkey order, the risk is split by line, and the purchase order must say so. The companion guide on avoiding counterfeit electronic components from China covers authorised channels, traceability documents, and inspection checks in detail. Read it before you decide which model to use, because the model you choose decides who must apply those checks.

How to Compare PCBA Quotations Like for Like

The cheapest PCBA quotation is often the one that left the most work out. Comparing quotations is therefore a job of normalisation: making sure every quotation covers the same board, the same components, the same tests, and the same delivery terms, and then finding the price differences that remain. A quotation comparison done well takes time, but it is far cheaper than discovering the missing work after the order is placed.

Start by checking that every quotation is for the same revision. A factory that quoted against an old BOM revision may have priced parts that no longer exist, or missed parts that were added. Ask each factory to state the BOM revision, the Gerber revision, and the centroid file revision its quotation is based on. If the revisions differ, ask for a requote. Keep a record of which revision each factory quoted against.

Next, break every quotation into the same cost elements and compare element by element. A PCBA quotation should contain, at minimum: bare-board fabrication cost, component costs by line or by group, assembly fees, setup charges, stencil cost, testing cost, programming cost, yield assumptions, and shipping cost. If a quotation does not break out these elements, ask for the breakdown. A lump-sum price cannot be compared with an itemised price, because you cannot tell what the lump sum includes.

Bare-board fabrication cost depends on the board specification: material, layer count, thickness, copper weight, surface finish, and panelisation. Check that every factory quoted the same specification. A factory that quoted a cheaper surface finish or a thinner copper weight has not quoted the same board.

Component costs are the largest element in most PCBA quotations, and the easiest place for quotations to diverge. Check that every factory quoted the same manufacturer part numbers, including the suffix, and the same quantities. Check the source channel: a quotation based on authorised-distributor pricing will be higher than one based on open-market or broker pricing, and the difference is a quality difference, not a saving. Check whether the component price is fixed for the quotation validity period, and what happens if the price moves before the purchase order. Check whether the quotation includes the overage allowance, and at what rate. A quotation that prices exactly the board quantity with no overage will run short in production.

Assembly fees cover the surface-mount and through-hole work. Check whether the fee is per board or per order, whether it covers both sides of the board, and whether hand soldering of through-hole parts is included or charged separately. Check whether the fee includes rework of boards that fail inspection, and how many rework cycles are included. A factory that includes one rework cycle and a factory that includes none are not quoting the same service.

Setup charges cover the one-off work: stencil, fixtures, programming setup, and line setup. Check whether the setup charge is a one-off or charged on every order. Check whether the stencil and the test fixture become your property. Check whether a design change triggers a new setup charge, and how large it is. Setup charges are often small relative to the total order, but they are a common source of surprise on repeat orders.

Testing cost covers the inspection and test methods in the quotation. Check which methods are included, at what coverage, and what is excluded. A quotation that includes 100 percent automated optical inspection and X-ray inspection of ball grid array joints is not comparable with one that includes only a visual check. Check whether the test fixture cost is included or separate, and whether the test program development is included or charged. Check whether functional test is included, and if so, who supplies the fixture and the program. Testing is covered in detail in the next section; at the comparison stage, the rule is that a quotation without a defined test scope has not priced the same job.

Yield assumptions are the part of a quotation that buyers most often ignore. A factory that assumes a 98 percent yield and a factory that assumes a 100 percent yield are quoting different quantities of finished boards. Ask each factory to state its yield assumption, and what happens if the actual yield is lower: does it build extra boards, does it charge for the shortfall, or does it ship short? Ask how many boards it will start in order to deliver the ordered quantity. If you order 1,000 boards and the factory starts 1,000 boards with no allowance for yield loss, you will receive fewer than 1,000 good boards. Agree in writing how many boards will be started, how many good boards will be delivered, and what happens to the balance.

Shipping cost should be compared on the same terms. Check the Incoterm, the destination, the shipping method, and whether insurance is included. A quotation that excludes freight is not comparable with one that includes it. The companion guide on package and ship electronics from China covers packaging and shipping choices for electronics in detail.

The table below is a template for the comparison. Fill one row per cost element and one column per factory, and mark every element that a factory did not quote as "not quoted" rather than assuming it is included.

Cost element Factory A Factory B Factory C
Bare-board fabrication
Component costs, by line
Assembly fees, surface-mount
Assembly fees, through-hole and hand soldering
Setup charges
Stencil cost
Inspection, SPI, AOI, X-ray
Electrical test, ICT, flying probe, boundary scan
Functional test and fixture
Programming
Yield assumption and boards started
Packaging
Shipping and insurance
Payment terms
Quotation validity period

The general RFQ guidance in the companion article on electronics supplier quotation and RFQ checklists also applies here. The difference for PCBA is that the cost elements are more numerous, the component risk is larger, and the test scope is a bigger share of the price. A thorough comparison takes those elements into account.

What Inspection and Testing Should You Require

Inspection and testing are not interchangeable. Inspection checks what a board looks like and whether its joints and placements meet a visible standard. Testing checks whether a board works electrically and functionally. A board can pass inspection and fail testing, and a board can pass a simple electrical test and still have a solder joint that will fail in the field. A good PCBA quality plan uses several methods in sequence, each catching the defects the earlier methods cannot see. This section describes each method, what it checks, where it sits in the production flow, and what its limits are, so you can specify the combination that fits your board.

Start with incoming component inspection. Before any component is placed, the factory should verify the components it received against the BOM: the manufacturer, the full part number including the suffix, the quantity, the date code, and the lot code. It should check the packaging for moisture sensitivity and electrostatic discharge protection, and check the visual condition of the parts. For buyer-supplied kits, the factory should verify the kit against the BOM line for line and report any shortage, wrong part, or damaged reel before production starts. Incoming inspection is the cheapest place to catch a wrong or counterfeit part, because the part has not yet been soldered to a board. Documentary traceability and incoming inspection provide evidence, not absolute proof of authenticity: for high-risk or independently sourced components, further methods may include electrical testing, X-ray, decapsulation or specialist laboratory analysis. The companion guide on avoiding counterfeit electronic components from China covers authenticity checks in detail.

Solder paste inspection, or SPI, is the earliest inspection gate on a surface-mount line, and the first inspection point. It is an automated three-dimensional measurement system that inspects solder-paste deposits immediately after printing and before component placement. It measures the volume, area, height, and positional accuracy and offset of every paste deposit on every board. Two-dimensional SPI captures only area and alignment; true three-dimensional SPI measures height and calculates volume. SPI catches insufficient, excessive, or missing paste, bridging, paste offset, and shape deformity, and it helps prevent tombstoning from uneven paste distribution. Its limit follows from its stage: it inspects paste only, before components exist, so it cannot by construction detect placement errors, reflow joint formation, or electrical faults. Two-dimensional SPI cannot measure volume. Industry guides commonly cite the estimate that a large share of surface-mount defects originate at the paste printing stage, which is why catching a bad print at SPI, when it can be wiped and reprinted, is far cheaper than reworking a board after reflow. SPI is most valuable on boards with fine-pitch parts, small passives, and tight paste-volume requirements, and least critical on boards with large parts and generous pads. Three-dimensional SPI is a strong process-control recommendation, especially for fine-pitch or dense assemblies: specify it in the purchase order where your board's risk justifies it, and require the inspection to cover every board, not a sample, where you specify it. Do not assume every board needs 100 percent three-dimensional SPI regardless of risk, process or contract.

Automated optical inspection, or AOI, uses cameras with controlled structured multi-angle lighting and analysis software, measures what it sees against a programmed standard, and inspects every board, not a sample. It sees missing, misaligned, rotated, or incorrect components, billboarding and tombstoning, insufficient or excess solder, bridging, lifted leads, and component or board damage. Three-dimensional AOI additionally measures joint height and coplanarity directly. Two-dimensional AOI is effective for presence and absence, polarity marks, and gross misplacement, but it infers volume and height from appearance. AOI is most commonly used after reflow, verifying finished joints and final placement against IPC-A-610 criteria, and some lines add a second pre-reflow AOI after placement. Its limits are that it cannot see hidden joints, such as the joints of fine-pitch ball grid arrays whose joints are hidden underneath the package entirely. Two-dimensional AOI cannot measure the third dimension: a joint with insufficient volume and a correctly formed one can present near-identical greyscale signatures from directly above, and a lifted lead can sit in a component-body shadow. AOI does not replace SPI; the two cover different stages. As one equipment maker puts it, AOI is the fastest method for identifying visible defects, while X-ray inspection is better suited for inspecting hidden features such as solder joints beneath ball grid arrays. One hundred percent post-reflow AOI is a common production control and a sensible baseline: specify it in the purchase order as a buyer requirement, not as an IPC mandate. Require three-dimensional AOI if your board has parts where joint height or coplanarity matters. The AOI program should be configured and validated against the agreed acceptance criteria; the standard is not itself an AOI program.

X-ray inspection, also called automatic X-ray inspection or AXI, is non-destructive X-ray imaging of internal solder structure. It is essential for packages with hidden joints, such as ball grid arrays and quad flat no-lead packages. It can help identify suspected head-in-pillow defects in ball grid arrays and other hidden-joint anomalies; detectability depends on the imaging method and package geometry. It also covers lifted, insufficient, and voided joints, bridging and shorts, and solder balls. Ball grid array defect modes include fine voids, cavities sized on the order of several tens to hundreds of micrometres, and unwetting and other forms of unmelted solder. X-ray inspection is done after reflow, at 100 percent coverage or selectively on ball grid array and quad flat no-lead parts only, on-line or off-line. Two-dimensional transmission X-ray suffers overlap and show-through from underside-mounted components and blurry voids, and is unsuitable for precisely inspecting fine voids or unmelted solder balls; its advantage is higher speed and smaller data. Computed tomography, or CT, captures images from all around 360 degrees and reconstructs three-dimensional data, giving clear reconstructed three-dimensional images free from overlaps; its disadvantage is larger data and slower inspection, and it is primarily adopted for detailed analysis of faulty products. A CT automated X-ray inspection system cuts hidden solder joints into hundreds of cross-section slices and isolates individual layers without the shadowing or interference of components on the opposite side, including head-in-pillow and voiding defects. CT is a more detailed, generally slower option, not a guaranteed solution to every hidden-joint problem. X-ray inspection is a structural and geometric method, not an electrical or functional test; it does not prove a board works. Plated through-hole barrel fill and pin penetration are a separate application from ball grid array and quad flat no-lead hidden-joint inspection, requiring suitable imaging angles and criteria. Require X-ray inspection where package geometry and product risk justify it, typically where your board has ball grid arrays or quad flat no-lead packages, and state which joints are inspected, whether the coverage is 100 percent or selective, whether it is two-dimensional or CT, and what the acceptance criteria are. A factory owning an X-ray machine does not by itself guarantee adequate inspection: ask for a sample image, defined coverage and acceptance criteria, and evidence that the chosen technique can inspect your actual package. A widely quoted void limit for ball grid array joints is commonly cited in industry guides as 25 percent void area per single ball grid array ball for Class 2 and Class 3, but that figure was not verified against the IPC text, and secondary sources conflict on it, so do not write it into a purchase order as an IPC requirement. Instead, require the factory to state its void acceptance criteria in writing and agree them with you before production.

In-circuit test, or ICT, is a node-oriented electrical test of the assembled board. It can effectively perform node-oriented open and short testing and component value testing for virtually all electrical components very quickly, with a bed-of-nails fixture accessing many points simultaneously. It also covers unpowered vectorless tests, digital vector tests, JTAG boundary scans, and mixed tests. It detects the faults supported by the test access, circuit design and programmed test coverage, including shorts, opens, missing components, incorrect component values for resistors, inductors, and capacitors, polarity and orientation issues for diodes, capacitors, and integrated circuits, basic semiconductor faults, solder defects, misoriented components, and wrong values. The fixture is a bed-of-nails: a dedicated fixture with spring pins contacting all test points simultaneously. It gives high speed and high coverage and is ideal for high-volume production, but it has a higher upfront fixture cost, and the fixture must match the printed circuit board design, accessibility, and cost constraints. High volume justifies fixture investment; low volume favours flexible approaches. ICT is normally done after assembly and reflow, before functional test in the usual layered flow, and it is the best option for high-volume manufacturing. Its limits are that it cannot test firmware or function as a system, because functional test is a separate method and ICT is component and node level. It has limited access on high-density and fine-pitch boards, and reduced coverage for ball grid arrays, stacked packages, and radio-frequency circuits. Node access is becoming more challenging due to board compactness as component geometry continues to shrink. Require ICT when your board is produced in volume, when component values and orientations must be verified on every board, and when the board has test points designed in. State the coverage you require: actual coverage depends on test-point access, circuit topology, test programming and the test equipment. If your board has no test points, ICT coverage will be poor, and you should address that in the design stage, not after the boards are built.

Flying-probe test is a fixtureless form of in-circuit test, and it is the usual alternative to bed-of-nails ICT for small batches. A generic board holder with multiple probes accesses individual nodes under software control, and the software is developed relatively quickly from the printed circuit board design files. It avoids a dedicated bed-of-nails electrical fixture: the board still needs mechanical support and holding in a generic board holder, and test programming is still required. There is no fixture fabrication time. It has lower upfront fixture and setup cost, but generally lower throughput and potentially higher test cost per board at volume, and it is flexible for prototypes and low-volume runs, new product introduction, and frequent design changes. Its limits are speed and coverage: the operating speed of flying-probe testers is slow compared with other types of automated test equipment because the probes have to physically move to each position in turn, and its coverage depends on probe access, test-point design, available powered-test capability and the test program; it may not provide the same test depth or throughput as a well-designed bed-of-nails ICT system. It is suitable for low-volume production and prototype applications due to speed limitation and flexibility, low development costs, and short development time. Require flying-probe test for prototypes, pilot batches, and low-volume production, and move to bed-of-nails ICT when the volume justifies the fixture investment.

Boundary scan, using the JTAG standard IEEE 1149.1 (IEEE 1149.1-2013, Standard for Test Access Port and Boundary-Scan Architecture), is a test method for high-density boards with limited physical access. Boundary-scan analysers deliver advanced digital test capabilities for high-density boards, enabling precise fault isolation on supported digital interconnections through a JTAG scan chain, reducing the need for physical probe access to individual nets, and provide fast diagnostics of interconnects, shorts, opens, and stuck-at faults across complex digital assemblies. Boundary scan still requires access to the TAP signals and provides coverage only for supported devices, pins and test configurations. Boundary scan supports JTAG-based scan chains and enables access to hard-to-reach nets, which is valuable for high-density boards with limited physical access and ball grid array pins. Its scope is limited to nets connected to boundary-scan-compliant devices; as a scope limitation, it does not cover non-JTAG nets, passive component values, or analogue behaviour. Require boundary scan when your board has boundary-scan-compliant devices and limited test-point access, and use it alongside ICT or flying-probe test rather than as a replacement for them.

Functional test, or FCT, powers up a fully assembled board and exercises it as the finished product will be used, checking real outputs against expected behaviour and defined pass and fail limits. It catches firmware, calibration, communication, and parametric faults that component-level tests cannot see. Typical checks include supply voltage, clock, control signals, sensor stimuli, and communication packets, and output voltages and currents, timing, frequency, communication replies, display and LED states, relay actuation, and radio-frequency power. It checks that firmware boots, that a regulator holds its setpoint under load, that a radio links, that an analogue-to-digital converter reads in range, and that calibration is valid. Functional test is commonly the final electrical gate before shipment, subject to the agreed production flow, at the end of the line, after AOI, X-ray, and ICT or flying probe, and after in-circuit programming and calibration if required. It needs a custom test fixture, often pogo pins with mating connectors, instrumentation, power supplies, and loads, and a test program and firmware emulating operating conditions. Test access, stimulus points, and pass and fail limits must be designed in from the start. Its limits are important to understand. It does not catch all component-value drift; as one test equipment maker states, it is difficult to predict test coverage up to the component level, and the functional test platform is better used for verifying that manufactured products meet their performance specifications, and is more useful as a quality gate rather than a defect finder. Diagnosis is coarse: functional test tells you a board failed a function, but it does not always pinpoint the faulty component. Coverage equals what the program exercises: a functional test only checks what the program exercises, and gaps in the test plan are gaps in coverage. It is not a reliability test: functional test confirms a board works now. Highly Accelerated Life Testing (HALT) is a design-development stress test: prototypes are stressed well beyond specification (temperature, vibration, thermal cycling) to discover design weaknesses and margins before production, not a routine production-line test. Burn-in (operating units for a set period to weed out early failures) and thermal cycling (repeated temperature excursions to test fatigue life) serve different purposes again, and may be used for qualification or production screening depending on the product. It also has longer per-board execution time and harder failure diagnosis than ICT. Define functional test as a buyer-agreed test of specified functions and operating conditions. Require it on every board where the board's firmware, calibration, communication or safety functions justify it, and require the test procedure, the pass and fail limits, and the fixture ownership to be agreed in writing before production.

The inspection and test plan below is a risk-based buyer recommendation to be specified in the purchase order. It is not a sequence mandated by IPC-A-610J or by any single IPC standard: the standards set acceptance criteria, and you choose the methods and coverage that fit your board and your risk. No single method covers everything, and not every test is mandatory for every assembly. The right combination depends on your package types, your volume, your test-point access, and your product risk.

Method What it checks Stage Best fit Key limit
Solder paste inspection Paste volume, area, height, position After printing, before placement Fine-pitch boards, small passives Paste only, no components or joints
Automated optical inspection Placement, polarity, visible joints After reflow, every board All boards as a baseline Cannot see hidden joints
X-ray inspection Hidden joints, voids, suspected head-in-pillow (detectability depends on method and package) After reflow Ball grid array and quad flat no-lead boards, where risk justifies it Structural only, does not prove function
In-circuit test Opens, shorts, values, orientation After assembly, before functional test High-volume production Needs bed-of-nails fixture and test points
Flying-probe test Opens, shorts, values, orientation After assembly Prototypes and low volume Slower; higher per-board cost at volume
Boundary scan Digital interconnects, shorts, opens After assembly High-density boards with JTAG devices Only supported devices and pins; needs TAP access
Functional test Real behaviour, firmware, calibration End of line, before shipment Boards where firmware or safety functions justify it (buyer-specified) Coarse diagnosis, coverage equals test program

Solder Paste, Stencil, and Reflow: Where Assembly Quality Is Decided

Most solder-joint defects are decided before the board ever enters the reflow oven. They are decided at the stencil printer, in the paste deposit, and in the reflow profile. A buyer does not need to operate a surface-mount line, but a buyer does need to understand enough of this process to ask the right questions, to read a factory's answers, and to recognise when a defect is a process problem rather than bad luck.

Solder paste is a mixture of fine metal-alloy powder suspended in flux paste. The powder melts in reflow to form the joint. The flux removes and reduces surface oxides, helps molten solder wet the pads and leads, gives tack to hold components in place before heating, and sets the printability and consistency of the paste. By weight, paste is mostly metal. For example, Indium's Indium8.9HF/HFA SAC305 datasheet lists a metal load of 88.5 percent for Type 3 powder (88.0 to 88.5 percent for Type 4, lower for finer powders). The exact figure depends on the paste formulation and powder type; check the datasheet for the paste actually used. By volume, the metal is only about half, and the rest is flux and non-metallic material, so a printed deposit visibly shrinks after reflow. Common alloys are SAC305, which is tin 96.5 percent, silver 3.0 percent, and copper 0.5 percent, tin-lead Sn63Pb37, and tin-bismuth low-temperature alloys. Powder size is classified under IPC-J-STD-005B, Requirements for Solder Pastes (Revision B, document dated March 2024). The types are nominal size classes, defined by weight: at least 80 percent of the powder must fall in the stated band. Type 3 is approximately 25 to 45 micrometres, Type 4 is approximately 20 to 38 micrometres, Type 5 is approximately 15 to 25 micrometres, and Type 6 is approximately 5 to 15 micrometres. The remaining particles fall in the oversize and undersize tails the standard allows, so a Type 5 paste is not guaranteed to contain no particle outside 15 to 25 micrometres. Finer types suit finer pitch and smaller apertures. Confirm the powder type on the paste manufacturer's datasheet. Ask the factory which paste alloy and which powder type it uses for your board, and confirm that the alloy matches your design and your environmental requirements. A lead-free design must not be built with leaded paste, and a low-temperature design must not be run on a standard lead-free profile.

The stencil controls where the paste goes and how much of it is deposited. A stencil is a thin sheet of foil with openings called apertures matching the board's solder pads. Paste is spread across the stencil and a metal squeegee forces paste through the apertures onto the pads, controlling paste location and volume per pad. Most surface-mount stencils are laser-cut stainless steel, commonly grade 304 (316 and 316L are also used), with foil thicknesses typically in the 0.08 to 0.20 mm range for surface-mount work (suppliers commonly offer 0.08 to 0.30 mm, thicker foil for large or through-hole parts), used from prototypes to volume production. These are examples of common manufacturing choices, not IPC requirements; the right foil thickness is set by the finest-pitch part on the board. Laser cutting is the dominant method, the apertures are slightly tapered, wider at the squeegee side, which aids release, and the stencil is often electropolished afterwards. Alternatives are electroformed nickel for very fine apertures, chemically etched stencils for coarser pitch, and polyimide stencils for low-cost prototypes. The aperture size does not have to equal the pad size. Reductions, rounded corners, and segmented openings help control paste volume. Aperture reduction is a common design technique to control paste volume: the aperture is often made slightly smaller than the pad to prevent bridging. One fabricator cites a 10 percent reduction for fine-pitch components, but that is one fabricator's recommendation, not a general industry rule; the actual size and shape depend on component geometry, paste volume, pitch and process requirements. Foil thickness and aperture size together set the deposit volume, and the finest-pitch part on the board usually sets the foil thickness. IPC-7525C, Stencil Design Guidelines (November 2021), is design guidance, not a mandatory set of rules. Commonly used design guidelines cited to it give an area ratio, the aperture opening area divided by the wall area, above 0.66, and an aspect ratio, the narrowest opening divided by the foil thickness, above 1.5, as starting points for reliable paste release. Treat these figures as commonly used design guidelines, not as IPC acceptance requirements.

Reflow soldering is the oven process that melts the paste and forms the joints. It has four process phases. These describe the thermal profile the board experiences, not four physical oven zones: a production oven may have ten or more zones, and not every SAC305 process uses a soak plateau. Some pastes run a linear ramp-to-spike profile, and the soak is used only where the assembly needs thermal equalisation. The paste supplier's datasheet decides which profile shape applies. In the preheat phase, also called ramp-up, the whole assembly is raised safely from ambient temperature toward about 150 degrees C at a controlled ramp. This evaporates solvents from the paste and begins flux activation. Too fast a ramp can cause solvent spattering and solder balls, and thermal shock and micro-cracks in ceramic capacitors. In the soak phase, also called the thermal soak or equaliser, the board is held at a plateau so that parts of very different thermal mass reach the same temperature before melting, and the flux activates to help strip oxides from pads and leads. Flux activation and oxide removal depend on the paste chemistry and the complete thermal profile, not on the soak alone. Soak duration and temperature can affect flux activity, volatile release and wetting. Their influence on graping, voiding and head-in-pillow depends on the paste chemistry, component and board design, surface condition and full thermal profile. In the reflow phase, also called the peak phase or time above liquidus, the alloy melts, wets the surfaces, and forms the intermetallic compound layer that is the actual bond, for example Cu6Sn5, and surface tension self-aligns slightly misplaced parts. Too short a time above liquidus can cause incomplete wetting and cold joints; too long can cause excessive intermetallic compound growth, which can make a joint more brittle and less reliable. There is no universal thickness limit: acceptable intermetallic thickness depends on the alloy, substrate, thermal history and the interface measured, and is set by agreement rather than by IPC-A-610 or J-STD-001, which set no maximum intermetallic thickness. In the cooling phase, the liquid solder returns to solid at a controlled slope. Cooling rate affects solidification microstructure and thermomechanical stress, and the acceptable range is process- and assembly-dependent. Do not treat slow cooling as always weak or fast cooling as always damaging.

The following is an illustrative profile for one SAC305 paste and process, not a production recipe. The alloy's liquidus temperature determines the time-above-liquidus reference point. The actual reflow profile must be selected from the solder-paste supplier's recommendations and verified against the PCB's thermal characteristics and every component's temperature limits. For SAC305, the alloy melting point and liquidus is 217 to 220 degrees C (Indium Corporation alloy data). For comparison, Sn63Pb37 leaded alloy is 183 degrees C eutectic, and low-temperature bismuth alloys are far lower: for example, 58Bi/42Sn is eutectic at 138 degrees C and the silver-bearing variant 57Bi/42Sn/1Ag melts at about 137 to 139 degrees C (Indium Corporation). For SAC305, preheat runs from ambient temperature, 25 degrees C, to 150 degrees C, at a ramp of 1 to 3 degrees C per second. Soak runs at 150 to 180 degrees C, with another page of the same source giving 150 to 200 degrees C, for 60 to 120 seconds. Reflow peak runs at 235 to 250 degrees C for SAC305, with time above liquidus of 45 to 90 seconds. For example, the Kester NP505-HR solder paste datasheet recommends a 235 to 250 degrees C peak and a 45 to 90 second reflow zone, and the Luminus SBM-40-HC device datasheet gives a 235 to 245 degrees C peak and 45 to 90 seconds above liquidus. These are example supplier-recommended ranges, not a universal window: insufficient or excessive time above liquidus can cause defects depending on the paste and assembly, and the supplier's profile window and measured board temperatures govern. Cooling runs at 2 to 4 degrees C per second. Ask the factory for a recorded reflow profile measured on a representative assembly with thermocouples at relevant locations, including thermally challenging components, and confirm that the measured profile falls within the paste supplier's recommended window and your components' temperature limits. Oven-zone settings alone are not the profile: board size, copper distribution, component mass and conveyor conditions change what the joints actually experience. A profile that is right for SAC305 is wrong for a leaded alloy and wrong for a low-temperature alloy.

Common reflow defects and their profile causes are worth knowing because they tell you what to ask when a sample fails. Tombstoning is when one end of a small passive, such as an 0402 or 0603 part, lifts and stands vertically. The root cause is torque imbalance: solder on one pad melts and wets before the other, and surface tension pulls the part upright. Rapid or uneven heating is one possible contributing factor; pad geometry, thermal mass, paste volume and wetting behaviour also matter. A cold solder joint can be caused by a peak temperature that is too low or a time above liquidus that is too short, and also by oxidised pads or leads, expired paste, and a high-thermal-mass pad without thermal-relief spokes. A dull, grainy appearance alone does not prove a cold joint: lead-free joints naturally solidify with a more matte, slightly grainy surface than leaded joints, and this is acceptable under IPC-A-610 where wetting and fillet shape meet the criteria. Judge by wetting, fillet shape and the named acceptance criteria, and by electrical testing or further investigation where needed, not by shine. Voiding is gas pockets and empty cavities inside the joint, visible only by X-ray; profile, flux chemistry, pad design, via-in-pad and volatile escape are interacting factors, and a short soak is one possible contributor, not the single cause. Solder balls can be caused by a ramp that is too fast and explosive outgassing. Head-in-pillow can be caused by flux exhaustion, oxidation, package or board warpage, solder-ball condition and paste behaviour: several possible contributors, not one cause. When a factory reports one of these defects, ask for the profile data and the SPI data for the affected boards. A factory that cannot produce the data is guessing at the cause.

The Most Common Problems and How to Prevent Them

Most PCBA failures are not mysteries. They are the same problems, repeated, and each one has a preventive control that costs far less than the failure. This section lists the most common problems, what causes each one, and what to write into your purchase agreement to prevent it.

Counterfeit or substituted components are the most expensive problem because they can pass visual inspection and fail in the field. A substituted part may have the same package and a similar marking but a different tolerance, a different temperature grade, or a different manufacturer. A counterfeit part may be a used part cleaned and remarked, or a lower-grade part remarked as a higher grade. Prevention starts with the BOM: state the full manufacturer part number including the suffix, state that no substitutions are allowed without your written approval, and state the approved channel for each line. In a turnkey order, require the factory to buy from the original manufacturer or an authorised distributor, and to provide traceability records. In a consigned order, buy the parts yourself through authorised channels and keep the purchase records. Require incoming inspection of every component line against the BOM, including the suffix, the date code, and the lot code. Documentary traceability and incoming inspection provide evidence, not absolute proof of authenticity: for high-risk or independently sourced components, further methods may include electrical testing, X-ray, decapsulation or specialist laboratory analysis. SAE AS6171B cautions that testing alone cannot establish authenticity; the strongest provenance evidence is a documented, unbroken chain of custody back to the original manufacturer. The companion guide on avoiding counterfeit electronic components from China covers the checks in detail.

Poor solder joints include cold joints, insufficient solder, bridging, and voids. Prevention is a combination of the controls in the previous section: a correct stencil design, three-dimensional SPI on every board, a reflow profile matched to the paste alloy, and AOI after reflow against IPC-A-610J at the named performance class. For ball grid arrays and quad flat no-lead packages, add X-ray inspection. Require the factory to record inspection results and to report the defect rate by defect type, so that a rising defect rate is visible before it becomes a shipment problem.

Wrong polarity is the reversal of a polarised component such as a diode, a tantalum capacitor, or an electrolytic capacitor. It is usually caused by a polarity mark that is unclear on the silkscreen, a centroid file rotation that is wrong, or an operator error. Prevention is to check that the polarity marks on the assembly drawing, the silkscreen, and the centroid file all agree, and to require AOI after reflow as the main control. AOI and first-article verification are important controls for polarity errors. Functional testing may detect a reversed component when the affected circuit or behaviour is exercised, but it should not be treated as a substitute for placement and polarity inspection. For high-risk parts, ask the factory to verify the first board of the production run by hand before running the full batch.

Insufficient testing is the problem of a board that was never tested, or tested with a test that cannot catch the faults that matter. A board that passes a visual check but was never powered up can have a dead microcontroller, a wrong firmware version, or a short that only shows under load. Prevention is to define the test scope in the purchase order: which methods, at what coverage, with what pass and fail limits, and who supplies the fixture and the program. Require functional test on every board where the board's firmware, calibration, communication or safety functions justify it, defined as a buyer-agreed test of specified functions and operating conditions, and require the test reports to ship with the goods.

Inconsistent batches are when the first order is good and the second order is different, in components, in process, or in quality. The usual cause is an unauthorised change: a substituted component, a different paste, a different stencil, a different subcontractor, or a process change that was never approved. Prevention is a written change-control clause: no engineering change, no component substitution, no process change, and no change of subcontractor without your written approval. Require the factory to notify you of any change before it is made, and require it to identify the production batch on every board and on the packaging, so that a problem in one batch can be traced to its cause.

Poor traceability is the problem of not being able to answer, after a failure, which components were used, which lot they came from, which production run built the board, and which inspection and test results applied. Prevention is to set the traceability requirement before the order. IPC-1782B, Standard for Manufacturing and Supply Chain Traceability of Electronic Products, Revision B, 2023, establishes minimum requirements for manufacturing and supply chain traceability based on perceived risk, and applies to printed board assemblies as well as mechanical assembly and printed board fabrication. It defines four levels, each existing separately for material data and for process data: Level 1 Basic, Level 2 Standard, Level 3 Advanced, and Level 4 Comprehensive. Internal traceability covers what happens inside the factory, and external traceability covers the supply chain. The level is agreed between user and supplier based on risk. As a buyer, you do not need the highest level for every product, but you do need to agree a level with the factory in writing, and to name the records that level will cover: component lot and date codes, the BOM revision used, the production batch, the inspection reports, and the test reports. Treat this as a recommended set of records to agree with the factory, not a mandatory list imposed by IPC-1782B itself. Do not present detailed per-level requirement tables as IPC-1782B text, because the level-by-level requirement tables in secondary sources often derive from the 2016 original material; the four level names and the internal and external split are the parts that are confirmed and safe to use. Agreeing a level and the records it implies does not mean the factory is "IPC-1782B certified": IPC-1782B is a traceability standard, not a factory certification.

PCBA RFQ Checklist

Send this checklist with your request for quotation. Tick each item before you send the package, and ask the factory to confirm each item in its reply.

  • Gerber files conforming to the Gerber Layer Format Specification, Revision 2026.05, one file per layer, with solder mask, paste, legend, and profile layers included; state the Gerber generation and attributes (X2/X3) exported
  • Drill data in a separate Excellon file, or ODB++ Format v8.1 Specification, Update 4, or IPC-2581 Rev C (November 2020) single-file package if the factory accepts it; confirm which fields the factory's CAM actually consumes
  • Gerber Job file or written board specification: material, layer count, thickness, copper weight, surface finish, solder mask colour, minimum trace and space, minimum drill size
  • Panelisation drawing or instruction, panel size, breakaway method, and fiducial positions
  • Bill of materials with revision letter, reference designator, quantity per board, manufacturer, full part number including suffix, package, value, and approved alternatives
  • Statement that no substitutions are allowed without written buyer approval, or list of approved alternatives with conditions
  • Centroid and pick-and-place file with X and Y coordinates, rotation, side of board, and reference designator for every surface-mount part
  • Assembly drawing with component outlines, reference designators, polarity marks, pin 1 marks, keep-out zones, and special assembly notes
  • Quantities: prototype quantity, first production quantity, expected annual volume, and volume steps for pricing
  • Sourcing model stated: turnkey, partial turnkey with line split, or consigned with kit requirements
  • Component sourcing constraints: authorised distributor only, approved independent distributor, or buyer-supplied lines
  • Testing requirements stated: SPI, AOI, X-ray, ICT, flying probe, boundary scan, functional test, with coverage and pass and fail limits (specify methods and coverage as a risk-based buyer plan, not as IPC-mandated steps)
  • Reflow profile evidence requested: a recorded profile measured on a representative assembly with thermocouples, within the paste supplier's recommended window
  • Programming requirements stated: firmware version, programming method, who supplies the firmware file
  • Special processes listed: conformal coating, potting, cable assembly, enclosure assembly, labelling, calibration
  • Acceptance standard and revision stated: IPC-A-610J (visual acceptance) and J-STD-001J (including its X-ray guidance in Appendix C), with performance class named; X-ray acceptance limits stated separately
  • Target delivery date, destination, Incoterm, and customs documentation requirements
  • Request for itemised quotation: bare board, components by line, assembly, setup, stencil, test, programming, yield assumption, packaging, shipping
  • Request for quotation validity period and payment terms in the reply
  • Record kept of exactly which file revisions were sent to each factory and on which date

Pre-Order Factory Verification Checklist

Complete this checklist before the purchase order is signed. Any item that cannot be verified is a reason to delay the order, not a reason to skip the check.

  • Factory name, address, and business licence checked; registered scope includes electronics manufacturing or assembly; legal entity, registered business scope and actual production site verified together, and the legal entity on the licence compared with the contracting party, invoice issuer and payment beneficiary (a licence proves the company exists, not that it owns the factory)
  • Live video call from the production floor showing surface-mount lines, inspection stations, and component stores (supporting evidence, not conclusive proof of manufacturing capability)
  • Surface-mount line list received: machine models, smallest package placed routinely, finest pitch placed routinely, maximum board size, double-sided capability
  • Through-hole capability confirmed: wave, selective, and hand soldering, and which method applies to your connectors and transformers
  • Mixed-technology sequence described for your board, with clearance for nozzles, pallets, fixtures, and rework tools
  • Inspection equipment confirmed by name: 3D SPI, AOI, X-ray, and which are owned and which are outsourced; X-ray capability demonstrated on your package type with a sample image, defined coverage and acceptance criteria
  • Test equipment confirmed by name: ICT, flying probe, boundary scan, functional test, and who supplies fixtures and programs
  • Quality system confirmed: acceptance standard and revision named, performance class named, inspector training confirmed, sample inspection report received
  • Design-for-manufacturing review confirmed: who reviews the files, what it covers, whether it is charged
  • Component procurement confirmed: distributor names, authorised channel policy, authenticity verification method, handling of allocated and obsolete parts
  • Moisture-sensitive and electrostatic discharge handling confirmed: sealed bags, humidity indicator cards, IPC/JEDEC J-STD-033D:2018 labels, baking only where the moisture-sensitivity level and exposure history require it, protected workstations
  • Sample or pilot batch built, inspected, powered up, and tested; defects recorded with photographs and closed with root cause
  • Reflow profile received as a measured thermocouple profile on a representative board, not oven settings alone; measured profile within the paste supplier's window and component temperature limits
  • BOM reviewed line by line by the factory in writing: availability, lead time, obsolete parts, minimum-order excess, and any part differing from specification
  • Sourcing arrangement settled line by line: who buys each line, from which channel, who is liable for authenticity, shortage, excess, and failure
  • Lead time received in writing, broken into bare board, components, tooling, assembly, test, packing, and shipping, with the longest-lead-time part named
  • Tooling and setup charges itemised: stencil, fixtures, test fixture, programming setup, and ownership and repeat-order rules
  • Payment terms confirmed: deposit, milestones, final payment trigger, currency, bank charges, and price validity
  • Acceptance criteria written into the purchase order: standard, revision, class, inspection and test scope, defect rules, rework rules, and shipping documents
  • Traceability level agreed in writing under IPC-1782B, with records named: lot and date codes, BOM revision, production batch, inspection and test reports
  • Change-control clause in the purchase order: no engineering change, substitution, process change, or subcontractor change without written buyer approval
  • Outsourced steps listed in writing with subcontractor names, and subcontractor capability verified or responsibility accepted by the main factory
  • References checked with a customer whose product resembles yours, including what went wrong and how the factory fixed it

Frequently Asked Questions

  1. What is PCBA? Printed circuit board assembly is the process of populating a bare board with components by solder paste printing, pick-and-place, reflow, through-hole soldering, inspection, and testing.
  2. What is the difference between a PCB and a PCBA? A PCB is the bare fabricated board. A PCBA is the bare board with all components soldered in place, inspected, and tested.
  3. What files do I need before asking for a PCBA quotation? Gerber files (Revision 2026.05), drill data, a BOM with revision, a centroid file, an assembly drawing, a board specification, quantities, and test requirements.
  4. What is a BOM? A bill of materials lists every component on the board with reference designator, quantity, manufacturer, full part number including suffix, package, and value.
  5. Why does the full part number including the suffix matter? The suffix often encodes tolerance, voltage rating, temperature grade, or packaging, so a part number without it cannot be priced or bought accurately.
  6. What is a centroid file? A pick-and-place file giving the X and Y coordinates, rotation, side of board, and reference designator for every surface-mount component.
  7. What is the Gerber format? The de facto standard format for PCB fabrication data, maintained by Ucamco, with one file per layer. The current specification is the Gerber Layer Format Specification, Revision 2026.05 (also known as Extended Gerber, or RS-274X). X2 adds standardised attributes and the CAD netlist; X3 adds component information.
  8. Can I send ODB++ or IPC-2581 instead of Gerber? Yes, if the factory accepts it. ODB++ (Format v8.1 Specification, Update 4) carries a complete product model in one compressed archive, and IPC-2581 Rev C (November 2020) carries fabrication, assembly, and test data in a single XML file. Confirm which fields your CAD exports and which the factory's CAM consumes.
  9. What is IPC-A-610J? The post-assembly acceptance standard, Revision J, dated March 2024 (announced by IPC on 8 April 2024), described as the most widely used electronics assembly acceptance standard. It gives visual acceptability criteria only; X-ray criteria come from J-STD-001.
  10. What is J-STD-001J? A principal industry-consensus standard for soldering processes and materials, current revision J, April 2024. It sets requirements for materials, methods and acceptance of soldered assemblies, including X-ray guidance in Appendix C, while IPC-A-610 gives the visual acceptability criteria for the finished assembly.
  11. What are IPC performance classes 1, 2, and 3? Class 1 is general electronic products, Class 2 is dedicated service electronic products, and Class 3 is high performance / harsh environment electronic products. The class reflects the intended end-use and performance requirements; it is not a factory grade or a reliability guarantee. The buyer must specify the class in the contract or purchase order.
  12. What is turnkey PCBA? The assembler buys all components and the bare boards, plus assembly, inspection, test, and packing. The buyer supplies design data and the BOM.
  13. What is partial turnkey PCBA? The buyer supplies selected lines, typically a programmed microcontroller or scarce integrated circuit, and the assembler buys the rest. The split is recorded line by line.
  14. What is consigned PCBA? The buyer supplies all components as a kit, and the assembler provides labour, stencil, and process, verifies the kit, assembles, and usually returns unused material.
  15. Does turnkey remove my excess stock risk? No. Suppliers buy in reel and minimum-order quantities, and most agreements make the customer liable for excess from minimum buys, engineering changes, forecast reductions, and cancellations.
  16. What overage should I supply in a consigned kit? Treat 3 to 10 percent on small passives as an illustrative planning range, not a rule; agree a specific quantity and maximum per line in advance, and have unused expensive parts accounted for or returned.
  17. What is SPI? Solder paste inspection, an automated 3D measurement system that checks paste volume, area, height, and position after printing and before placement. It is the earliest inspection gate on a surface-mount line.
  18. What is AOI? Automated optical inspection, which uses cameras and controlled lighting to check placement, polarity, and visible solder joints on every board, most commonly after reflow.
  19. Can AOI see ball grid array joints? No. Ball grid array joints are hidden underneath the package, so X-ray inspection is needed for them.
  20. What is X-ray inspection? Non-destructive X-ray imaging of internal solder structure, essential for ball grid arrays and quad flat no-lead packages. It can help identify suspected head-in-pillow and other hidden-joint anomalies (detectability depends on the imaging method and package), plus voids, bridging, and barrel fill. It is structural inspection, not proof the board works.
  21. What is ICT? In-circuit test, a node-oriented electrical test using a bed-of-nails fixture to check opens, shorts, component values, and orientation, best suited to high-volume production.
  22. What is flying-probe test? A fixtureless form of in-circuit test that accesses nodes with moving probes under software control, suited to prototypes and low-volume runs. It has lower upfront fixture cost but is slower than bed-of-nails ICT and can cost more per board at volume.
  23. What is functional test? A test that powers up the finished board and exercises it as the product will be used, checking real outputs against defined pass and fail limits. It is commonly the final electrical gate before shipment, subject to the agreed production flow. It confirms a board works under the tested conditions; it is not a reliability test.
  24. What is boundary scan? A JTAG-based test method under IEEE 1149.1 for high-density boards, giving fault isolation on supported digital interconnects through a JTAG scan chain. It still needs access to the TAP signals and covers only supported devices and pins.
  25. Which tests do I need for my board? It depends on package types, volume, and risk. AOI after reflow is a common baseline. Add X-ray where ball grid arrays or hidden joints justify it, ICT or flying probe for electrical verification, and functional test where firmware or safety functions justify it. Specify the methods and coverage in the purchase order: these are buyer choices, not IPC mandates.
  26. What is SAC305? A lead-free solder alloy of tin 96.5 percent, silver 3.0 percent, and copper 0.5 percent, with a liquidus of 217 to 220 degrees C.
  27. What reflow peak temperature applies to SAC305? A peak of 235 to 250 degrees C, with time above liquidus of 45 to 90 seconds, as an illustrative example from paste and device manufacturer datasheets. These figures are SAC305-specific, are not a production recipe, and do not apply to leaded or low-temperature alloys. The actual profile comes from the paste supplier's recommendations and must be verified with a measured thermocouple profile on a representative board.
  28. What causes tombstoning? One end of a small passive lifts and stands vertically, because solder on one pad melts and wets before the other and surface tension pulls the part upright. Rapid or uneven heating is one possible contributing factor; pad geometry, thermal mass, paste volume and wetting behaviour also matter.

Conclusion

Sourcing PCBA from China is a manageable job when it is treated as an engineering and documentation discipline rather than a shopping exercise. The work that matters most happens before the purchase order: a complete data package, a named acceptance standard with a named performance class, a line-by-line sourcing decision, and a defined inspection and test plan. The factory that can answer those points in writing, show you its lines and its records, and build a sample that passes your tests is a factory you can work with. The factory that cannot answer them, or that asks you to trust a label instead of a written definition, is a factory you should not pay yet.

Use the two checklists at the end of this guide as working documents. Send the RFQ checklist with your first enquiry, and complete the verification checklist before you sign the purchase order. Keep the records: the file revisions you sent, the quotation revisions you received, the sample results, the inspection reports, and the test reports. Those records are what turn a one-off order into a repeatable supply chain, and they are what protect you when something goes wrong. The cheapest board is the one that works the first time, in your customer's hands, batch after batch.

Sources